List of some notable completed previous installations, by Directional Drilling
- Chris Weatherall
- Jul 12, 2020
- 1 min read
Updated: Aug 24
Directional drilling for 400kV Wind Farm works for Balfour Beatty and Ørsted 400kV WIND FARM | SWDD
100m x 900mm Gravity Drainage in rock for NMC/ Severn Trent, installed by directional drilling through rock (and various obstructions) 900MM DRAINAGE | SWDD
Multi duct directional drilling for 42 no M5 Motorway Crossings for Balfour Beatty Mott McDonald JV (BBMJV), every required installation completed 42 X M5 CROSSINGS | SWDD
Directional drilling of a River Crossing for 250m x 280mm drainage pipe, for Somerset Drainage Boards Consortium 250M RIVER CROSSING | SWDD









Comments