top of page
Search

List of some notable completed previous installations

  • Chris Weatherall
  • Jul 13, 2020
  • 1 min read

Updated: Jan 12, 2024

400kV Wind Farm works for Balfour Beatty and Ørsted 400kV WIND FARM | SWDD

100m x 900mm Gravity Drainage in rock for NMC/ Severn Trent 900MM DRAINAGE | SWDD

42 no M5 Motorway Crossings for Balfour Beatty Mott McDonald JV (BBMJV) 42 X M5 CROSSINGS | SWDD

250m x 280mm River Crossing for Somerset Drainage Boards Consortium 250M RIVER CROSSING | SWDD


Directional Drilling Design by SWDD
400kV Wind Farm installations

SWDD curved gravity drainage design
900mm curved gravity drainage by HDD

DitchWitch JT100 Directional Drilling rig
Directional Drilling setup for motorway crossing

River Crossing Directional Drilling
250m River Crossing by Directional Drilling

 
 
 

Recent Posts

See All

Comments


© 2024 S.W.Directional Drilling Ltd

  • Facebook
  • Twitter
bottom of page